Business & Industry

Obtaining a Building Permit

Step 1: Zoning Verification and Land Use Permit Planning Department (919) 989-5150.

  • Submit a Site Plan (may include a stormwater plan).
  • Allow approximately two weeks for review process by the Planning Dept. and the Stormwater Administrator.
  • Appropriate fees are required for Dept.’s review.

Step 2: Public Utilities Dept. for water/sewer confirmation (919) 989-5075 or Environmental Health for well/septic permit (919) 989-5180.

  • Clarify whether site for industry or commercial development will receive water/sewer service from County, or whether site will require a well or septic tank. State approval may be necessary for subsurface disposal.

Step 3: Building Inspections Department (Building Permit)* (919) 989-5060

  • Submit 2 sets of building plans that have been sealed by an NC Engineer, copy of Land Use Permit, Public Utilities/Env. Health confirmation of water/sewer service and 911 address.
  • Allow approximately 2-3 weeks for review.
  • Pay prevailing fees for building permit.

Note: These departmental reviews must occur in order to obtain a building permit for an area in un-incorporated portions of Johnston County. If the area is located inside a municipal jurisdiction or its ETJ, then at municipality’s policies and regulations shall apply and be administered by that entity.

* The Building Inspections Department can review certified building plans during or in advance of the issuance of a land use and stormwater permit. However, no building permit can be issued until all regulatory reviews have occurred.

 

News & Events

ACE FABRICATION EXPANSION HIGHLIGHTS JOCO’S ROLE IN LIFE SCIENCES READ MORE

SHIFTING U.S. DEFENSE NEEDS COULD SPELL JOBS FOR JOCO READ MORE

GLOBAL MAKER OF FUEL HANDLING SYSTEMS GROWS ITS JOCO PRESENCE READ MORE

CLEANROOM AND STAINLESS TANKING MANUFACTURERS LAUNCH $7.5 MILLION EXPANSION READ MORE